<aside> ✋

Welcome to the Octave EMS Wiki

Your starting point for commissioning, operating, and troubleshooting the Octave Energy Management System (EMS).

</aside>


Who this is for


Installation & commissioning guides

<aside> ❗

Spotted a typo, inconsistency, or missing step in the guides below? Please reach out at [email protected], we value your feedback.

</aside>

EdgeBox installation

Octave Edgebox

RTU Package installation

Octave — WAGO CC100 Controller

Octave — WAGO Remote I/O

Site Onboarding

https://octave.energy/onboarding

A1 Dongles installation

Octave — Xemex A1MB

Octave — Xemex Smart Connect


Integrations library

<aside> ❓

If your device is not listed, email [email protected] so we can confirm compatibility and plan the integration. Typically, an integration takes max. 2 months.

</aside>

Energy meters

PV Devices


Partner API

For cloud-to-cloud integrations with Octave’s EMS platform.